Finishing touches to the shuttering, reinforcement bars and plastic sheeting in preparation for pouring concrete to make the floor of the third level. |
|
|
A deeper, shored hole to the side of the Temple
construction site, combined with a rented heavy diesel pump, help better
drain the Kunda.
|
The pipe takes water off to the next kunda, while
the steps on this southern bank continue to rise.
|