All glories to Sri Guru and Sri Gauranga Sri Sevashram Progress 22nd February 2002 |
|
|
The Sevashram and the steps progress side by side. |
The last of the first level of rooms has the door frame installed. |
|
|
Straightening wooden shuttering for an upright pillar. |
The deep veranda of the south facing building. |
|
|
The walkway makes its way towards the existing steps to the Kunda. |
General view of construction so far. |
Sevashram
floor plan
|