glories to Sri Guru and Sri Gauranga 14 February 2003 |
|
|
Siva Mandir: electrical conduits downstairs and upstairs. |
|
|
All the inside of the room above the altar as well as the inside of the dome has been plastered. | Adding a banana tree on the front of the upper level. |
|
|
Continuing work on the smaller domes. | Intermediary banister supports being added. |
|