The front upper outside section of the new Temple's dome with more of the design evolving. |
![]() |
|
Plastering nears completion inside the main part of the dome. |
![]() |
![]() |
Looking across to the growing Siva Mandir. | Plastering of the roof's wall as well as the facade of the third floor. |
![]() |
![]() |
Preparing for tiling behind the recently installed sinks. | All floors of the upper storey's rooms are tiled with marble, the skirting marble is now being set in place. |
![]() |
![]() |
Plastering of the upper staircase nears completion. | Tilak takes shape along the roof's wall. |